Plates per change-out times cost per plate, plus bolts, wire, consumables, and crane time.
Quarry and aggregate maintenance
Plate price is the small number. LinerHQ adds install labor and lost production, then turns observed liner life into change-outs per year, annual cost, and cost per ton.
Workbook example · not a customer result
Four sample locations in the workbook total $276,111 a year. The sample alternative on the feed chute saves $31,093 a year if it reaches the life entered in the sheet. Your plant will not match these figures.
Plates per change-out times cost per plate, plus bolts, wire, consumables, and crane time.
Total crew hours — cutting, welding, lifting, cleanup — times your labor rate.
Hours the location is down times lost production per hour, or your standard downtime rate.
01
Operating weeks per year, and plant tons per year if you want an overall cost per ton. The default is 50 weeks.
02
Plates per change-out, plate cost, other parts, crew hours, labor rate, downtime hours, and what an hour of downtime costs you.
03
Weeks or tons. If you track tons, add the tons that pass through that location in a year.
04
Put in its price and the life you expect. LinerHQ shows annual savings, the break-even life, and how fast the extra up-front cost pays back.
LinerHQ does not tell you how long a plate will last. You enter the life — from your history, a trial, or a supplier quote — and the math stays on the server.
Per plant
$79 / month
or $790 per year. 14-day trial. Up to 20 wear locations.
Free accounts keep 3 locations per plant, with no card.